The MyJetSupport platform

One work order, from the due list to the invoice.

Planning, the tool crib, stores, the time clock, sign-off and billing all work from the same work order, the same roster and the same badge. Nothing is typed twice.

Business jets under maintenance in an open hangar

How it works

Follow one aircraft through the hangar

Step 1 · MRO Planning

Due list to work package

Inspections, components and ADs coming due are pulled into a work package for the aircraft.

  • Due by hours, cycles and dates
  • Discrepancies from the floor join the same package
  • Planned hours set per task

Who: Planner

Step 2 · Maintenance Control

Work order and job cards

The package opens a work order. Each job card gets a control number and a QR sticker.

  • RII items marked before work starts
  • Roster set for the work order
  • The customer desk sees status and approves extra work

Who: Planner, Director of Maintenance, Project Manager

Step 3 · The Tool Crib · MRO Stores · Man-Hour Tracking

At the station: tools, parts, hours

The technician scans the card sticker and badges in. Tools are signed out, parts issued and time clocked against that work order.

  • Calibration checked before a tool goes out
  • Parts issued with their certificate
  • One badge and PIN for all three

Who: Technicians, stores

Step 4 · Workstation

Sign-off and RII

Work is signed with badge and PIN; an independent inspector signs the RII items.

  • Authorization and training checked at each signature
  • Corrections keep the original entry
  • Revoking a signature needs a reason

Who: Technicians, inspectors, certifying staff

Step 5 · Maintenance Control

Return to service

The work order is released only when every card is closed, every RII is signed and the tools and parts are back.

  • Blocking items listed plainly
  • Planning rolls the next due dates forward
  • The work pack is ready for the records

Who: Certifying staff, Director of Maintenance

Step 6 · MRO Invoicing

Invoice

The hours and parts already on the work order become invoice lines.

  • Labor from the time clock
  • Parts and outside work from stores
  • Sent to QuickBooks or Xero

Who: Billing, CFO

Calibrated test equipment and hand tools on a workbench beside a turbine engine

One station on the hangar floor

One badge for tools, parts and hours

The crib station tablet has three tabs. A technician scans the job card, badges in once, and the tool, the part and the time all land on that work order.

ToolsSigned out and back, calibration checked
PartsIssued with their certificate and lot
HoursClocked on and off the task

Built for real hangar Wi-Fi: if the connection drops, entries stay on screen and nothing is recorded twice.

When the job needs more than your own hangar

A tool you don’t own: borrow it, calibrated, from another member, and track it on the same work order.

The Tool Crib ›

No room in your hangar: find space for the project, long-term parking or one night.

Hangar Parking ›

Technical services

An engineer on site: pre-purchase surveys, conformity, oversight and contract engineers.

Our engineers ›
20% off, both waysTool Crib members take 20% off Maintenance Control. Maintenance Control subscribers take 20% off The Tool Crib membership. Taken off automatically when you sign in.

Sized to your operation, from one technician to several stations.

The Tool Crib